Currency PKR
PLC Installation and Commissioning order in Lahore
Order PLC Installation and Commissioning
PLC Installation and Commissioning

PLC Installation and Commissioning

Reconfirm the price with seller
Seller
Pakistan, Lahore
(View map)
+92  
Display phones
Description
Typical installation
  • Typical installation (enclosure, disconnect device, fused isolation transformer, master control relay, terminal blocks and wiring ducts, suppression devices).
  • Spacing controllers - follow the recommended minimum spacing to allow the convection cooling.
  • Preventing excessive heat
  • Grounding guidelines.
  • Power considerations.
  • Safety considerations.
  • Preventive maintenance considerations.

Commissioning and testing of a PLC system

  • Checking that all cable connections between the PLC and the plant are complete, safe, and to the required specification and meeting local standards.
  • Checking that all the incoming power supply matches the voltage setting for which the PLC is set.
  • Checking that all protective devices are set to their appropriate trip settings.
  • Checking that emergency stop button work.
  • Checking that all input/output devices are connected to the correct input/output points and giving the correct signals.
  • Loading and testing the software.
Contact the seller
PLC Installation and Commissioning
PLC Installation and Commissioning
We recommend to see
Compare0
ClearSelected items: 0